Capture differing site conditions, multi-machine hours, and import/export overages while the crew’s still moving dirt — not reconstructed from memory at billing time.
Rock where the geotech report said soil, groundwater higher than predicted, contaminated material — these aren't rare surprises for excavation, they're a standard part of the risk. Documenting exactly what was hit, when, and how the crew responded is what turns "we found rock" into a paid change instead of an absorbed loss.
An excavator, a dozer, and a fleet of haul trucks might all be running the same day, some owned and some rented, each on its own clock. Tracking which machine worked which hours on which part of the site, on paper, falls apart fast once more than one or two machines are moving.
More unsuitable soil than expected means more export hauling and more import fill than the bid accounted for — measured in actual yards moved, not the original estimate. Without a record tied to the day it happened, the extra tonnage is nearly impossible to reconstruct at billing time.
Create tickets, capture photos, and see accurate pricing with zero connection.
Read moreCreate tickets, capture photos, and see accurate pricing with zero connection.
Read moreCreate tickets, capture photos, and see accurate pricing with zero connection.
Read moreNothing matches that search.
Log labor, materials, and equipment from your phone - photos, timestamp, and GPS included, even with no signal.
Every line pulls its rate from your rate sheet automatically - no manual pricing, no guessing.
Nothing matches that search.