Getting approval without chasing your GC
Create tickets, capture photos, and see accurate pricing with zero connection.
Read moreSolutions for waterproofing contractors
Capture membrane condition, flood-test outcomes, and diagnostic time while the evidence is still visible — before backfill, decking, or the next trade covers it for good.
Rebar tie-ins, scaffolding, form stripping, or a subsequent trade walking through wet material can compromise a membrane without anyone noticing until the leak shows up months later. Documenting its condition — and who was on-site when — before it gets covered is the only way to settle who's responsible for a repair.
Many systems require a flood test or manufacturer inspection before they can be covered by backfill, a plaza deck, or roofing. A failed test means locating and repairing the leak on the clock — work that's rarely priced into the original bid, because nobody plans for a test to fail.
Remedial waterproofing often starts as an investigation, not a repair — the actual scope isn't known until the source is found. That diagnostic time has to be billed on its own, separate from whatever remediation follows once the cause is confirmed.
Create tickets, capture photos, and see accurate pricing with zero connection.
Read moreCreate tickets, capture photos, and see accurate pricing with zero connection.
Read moreCreate tickets, capture photos, and see accurate pricing with zero connection.
Read moreNothing matches that search.
Log labor, materials, and equipment from your phone - photos, timestamp, and GPS included, even with no signal.
Every line pulls its rate from your rate sheet automatically - no manual pricing, no guessing.
Nothing matches that search.