Solutions for plumbing contractors

T&M billing that doesn't disappear under the slab

Capture underground rough-in, inspection rework, and fixture changes while they’re still visible — because once the concrete pours, there’s no revisiting what’s underneath.

Where plumbing crews lose time

Once the slab pours, there's no going back

Underground rough-in gets buried under concrete, not drywall — there's no cutting it open later to check what's there. If it isn't documented and priced before the pour, that record is gone for good.

A failed inspection isn't automatically a redo on your dime

Rough-in has to pass inspection before it gets covered. When the rework traces back to a changed condition or an inspector's call rather than a mistake on the crew's part, that extra time needs its own record — otherwise it quietly gets absorbed into the original bid.

A relocated fixture means re-running the line, not just moving a box

A late tenant request to add a floor drain or move a sink isn't a small edit the way relocating an outlet might be — it can mean re-trenching or rerouting a line that's already set. That labor needs its own ticket, not a note folded into the original scope.

Relevant Use Cases

Approval

Getting approval without chasing your GC

Create tickets, capture photos, and see accurate pricing with zero connection.

Read more
Field Ops

Working through a no-signal jobsite

Create tickets, capture photos, and see accurate pricing with zero connection.

Read more
Field Ops

Documenting the work actually happened

Create tickets, capture photos, and see accurate pricing with zero connection.

Read more

Built with these features

Field Ticket Creation

Mobile Ticket entry, even offline

Log labor, materials, and equipment from your phone - photos, timestamp, and GPS included, even with no signal.

Field Ticket Creation

Rates applied automatically

Every line pulls its rate from your rate sheet automatically - no manual pricing, no guessing.

Ready to stop reconstructing tickets from memory?